Importance of refrigerants in new energy vehicle battery test systems
If the flow rate of the refrigerant in the new energy vehicle battery test system is extremely small, the refrigerant will start to expand from the first expandable space at the rear end of the throttle valve. Most of the see-up of the rear end of the expansion valve is often due to lack of cooling. Or the expansion valve flow is not enough, too little refrigerant expansion will not use all the evaporator area, only the low temperature is formed locally in the evaporator, and some areas are rapidly expanded due to the small amount of refrigerant, causing the local temperature to be too low, and the evaporator appears. Frosting.
After local frosting, due to the formation of a thermal insulation layer on the surface of the evaporator, the heat exchange amount in the area is low, the expansion of the refrigerant is transferred to other areas, and the entire evaporator is frosted or frozen, and the entire evaporator is insulated. The layer, then the expansion spreads to the compressor return pipe causing the compressor to return to the air. Since the amount of refrigerant is too small, the evaporation pressure of the evaporator is low, resulting in low evaporation temperature, which will gradually lead to condensation of the evaporator to form a heat insulation layer and transfer the expansion point to the compressor return air to cause the compressor to return to the air. All of the above points will show the evaporator frosting before the compressor of the new energy vehicle battery test system returns to air.

If the new energy vehicle battery test system has a heat bypass valve, then just adjust the hot gas bypass valve. The specific method: open the rear end cover of the hot gas bypass valve, and then use the 8th hex wrench to turn the adjustment inside the clockwise Nut, the adjustment process should not be too fast, generally pause for about half a circle, let the system run for a period of time to see the frost condition and then decide whether to continue to adjust. After the operation is stable, the compressor frosting phenomenon disappears and the end cap is tightened. For models below 15 cubic meters, since there is no hot gas bypass valve, if the frosting phenomenon is serious, the take-off pressure of the pressure switch of the condensing fan can be appropriately adjusted.
Specific method: first find the pressure switch, remove the adjustment nut of the pressure switch to fix the small piece, and then use a Phillips screwdriver to rotate clockwise, the whole adjustment also needs to be carried out slowly, adjust a half circle to see the situation and then decide whether it needs adjustment.
Therefore, the refrigerant in the new energy vehicle battery test system is very important. Secondly, the choice of refrigerant is also very important. The mixed refrigerants of professional manufacturers of production equipment have certain advantages in performance, so it is recommended that users choose according to their own needs.
Похожие рекомендации
-
Chip test system analysis why chip test?
1227Functional failure means that a function point is not implemented. This is often caused by design. Usually, it is verified by simulation before the design stage, so usually a chip is designed and the simulation verification takes about 80% of the ...
Посмотреть детали -
Как очистить систему управления воздухом?
1353In order to respond to the requirements of the two types of society in the country, environmental protection and conservation have become increasingly important. Therefore, in order to extend the life of the product, it is still necessary to have ...
Посмотреть детали -
Selection of Temperature Control System for Laboratory Resin Reaction Kettle
10571. Choose from the quality of the laboratory resin reactor temperature control system: can affect the quality of the laboratory resin reactor temperature control system, may be the use of accessories. There are some small factories on the market t...
Посмотреть детали -
High and low temperature integrated machine equipment blockage instructions
971If the high and low temperature integrated machine equipment is running for a long time, if it is not taken care of, it may cause the high and low temperature integrated machine equipment to be blocked. How to solve the equipment blockage? The fir...
Посмотреть детали