Вакуумное описание системы обнаружения аккумулятора новой энергии автомобиля
The new energy power vehicle power battery test checks the vacuum pump switch in the closed state before operation; when the vacuum pump is placed horizontally, ensure that the lubricating oil and the oil level line are kept horizontal; whether the sealing rubber pad is damaged; whether the pressure gauge needle is returned to zero. Place the vacuum pump on the indoor floor (safe, stable, and easy to operate). It is forbidden to be placed outdoors, and it is not allowed to be placed on the power battery test of new energy power vehicles. Combine the fluoridation tube, pressure gauge and vacuum pump, unscrew the nut at the fluorination port from the large valve, screw the fluorotube onto the fluoride port, and confirm whether the thimble is in the top position. (It is forbidden to tighten the joint with tools such as pliers). First open the pressure gauge valve, then open the vacuum pump power switch and start vacuuming.
Observe the pressure gauge (low pressure) when vacuuming. Stop the vacuum after the pressure reaches -0.1 MPa (negative pressure). The vacuuming time should be determined according to the size of the model and the vacuum pump. The reference time is 10 to 30 minutes, not less than 5 minutes. And should be based on the pressure value displayed on the pressure gauge. First close the pressure gauge valve and then turn off the vacuum pump power switch. Remove the fluorinated tube from the vacuum pump and tighten the air pump nozzle cap to prevent dust from entering. After vacuuming, the pressure must be checked after the pressure is maintained. The pressure is not more than -0.08MPa. If the pressure is greater than -0.08 MPa, the cause of the leak should be found. The pressure is not more than -0.08 MPa (a small amount of rebound with a pressure of 0.02 MPa is allowed). If the pressure is greater than -0.08 MPa, indicating that there is a leak, find the cause of the leak and repeat the above procedure after solving it.

The new energy power vehicle power battery test confirms that there is no leak point and then opens the small valve spool. When the pressure (low pressure) reaches 0.1 MPa-0.5 MPa, the small valve is closed. When the pressure gauge pointer does not move, the pressure gauge valve should be opened a little to see if there is gas discharge. If there is no gas discharge, the fluorine tube is not connected with the valve. The thimble of the fluorine tube does not open the top core of the valve. . At this point, the vacuuming operation should be repeated (starting from the fourth step). After confirming the end of the pumping operation, quickly remove the fluoridation tube and pressure gauge, and then re-open the small valve and turn it back half a turn. After fully opening the large valve and turning a half turn, immediately tighten the valve back cover nut to prevent the valve core rubber seal from leaking and tighten the nut.
The vacuum state of the new energy power vehicle power battery test has a certain impact on its operation, so we need to avoid these external factors that affect the new energy power car power battery detection system.
Похожие рекомендации
-
Cooling and shrinking assembly freezer for metal parts and common assembly methods in the industry
1569In the cold shrink production of copper sleeves, bearings, etc., quick-freezing cryogenic boxes are widely used in mechanical assembly. Copper sleeve cooling shrink assembly cabinet variable temperature assembly method is to heat the hole or cool ...
Посмотреть детали -
Подробный тест электродвигателя электромобиля и испытательная система
1052Новые энергетические транспортные средства должны иметь возможность тестирования силовой системы, системы привода, системы управления, а также возможность тестирования функций электронной системы управления. Для производителей компонентов такая возможность разработки тестов также ...
Посмотреть детали -
Как справиться с неисправностью промышленной системы охлаждения воды?
1197Что не так с промышленной системой охлаждения воды, когда она не может охладить? Позвольте LNEYA объяснить вам это ниже: Одной из причин является то, что при первоначальном использовании системы охлаждения жидкости не удается снизить температуру, или что-то не так с ...
Посмотреть детали -
ISG/TM Motor Test Cooling System High Voltage Failure and Treatment Measures
1238The ISG/TM motor test cooling system is divided into two types in the industry: air-cooled and water-cooled. The working principle is to first inject a certain amount of water into the water tank in the machine, and then pass the ISG/TM motor test...