ΠΠ΅ΡΡ ΠΏΡΠ΅Π΄ΠΎΡΡΠΎΡΠΎΠΆΠ½ΠΎΡΡΠΈ ΠΏΡΠΈ ΡΡΡΠ°Π½ΠΎΠ²ΠΊΠ΅ ΡΠΏΠ΅ΡΠΈΠ°Π»ΡΠ½ΠΎΠ³ΠΎ ΠΎΡ Π»Π°Π΄ΠΈΡΠ΅Π»Ρ Π΄Π»Ρ ΠΈΡΠΏΡΡΠ°Π½ΠΈΡ Π½ΠΎΠ²ΠΎΠΉ ΡΠ½Π΅ΡΠ³ΠΈΠΈ
The installation of the special chiller for new energy testing is an important link before operation. The quality of the installation is directly related to the operation and operation status of the special chiller for new energy testing. So, what should be paid attention to in the installation of the special chiller for new energy testing?
If the special chiller for new energy test adopts semi-hermetic or fully-hermetic compressor, an oil separator should be installed, and an appropriate amount of oil should be added to the installed oil separator. When the evaporation temperature is lower than -15 degrees, a gas-liquid should be installed. Separator and add appropriate amount of refrigeration oil. Secondly, the compressor base should be installed with a shock-absorbing rubber seat, and the installation of the special chiller for new energy testing should leave a maintenance space to facilitate the observation of the adjustment of instruments and valves.
The high pressure gauge of the special chiller for new energy testing should be installed at the tee of the liquid storage and filling valve. The overall layout of the special chiller for new energy testing is reasonable and the color is the same. The installation structure of each type of unit should be consistent.
When debugging the special chiller for new energy test, it is necessary to pay attention to measuring the power supply voltage, measuring the resistance value of the three windings of the compressor and the insulation of the motor, checking the opening and closing of each valve of the refrigeration system, and pouring the refrigerant into the storage liquid to the standard charge after evacuation. 70%-80% of the filling volume, and then run the compressor, add air from low pressure to enough volume.
After the special chiller for new energy test is turned on, first listen to whether the sound of the compressor is normal, check whether the condenser and air cooler are running normally, and whether the three-phase current of the compressor is stable. After the special chiller for new energy test cools down smoothly, check the exhaust pressure, suction pressure, exhaust temperature, suction temperature, motor temperature, crankcase temperature, and expansion valve temperature in the refrigeration system, and observe the frosting of the evaporator and expansion valve. , observe the oil level and color change of the oil glass. Check whether the sound of the special chiller for new energy testing is abnormal.
Another point is that the special chiller for new energy testing needs to pay more attention to its maintenance knowledge and carry out a lot of related maintenance work.
ΠΠΎΡ
ΠΎΠΆΠΈΠ΅ ΡΠ΅ΠΊΠΎΠΌΠ΅Π½Π΄Π°ΡΠΈΠΈ
-
Multi-stage refrigeration system centrifugal compressor repair instructions
2122After the centrifugal compressor of the cascade refrigeration system is disassembled, the dimensions of each journal (cooperating with the impeller, bearing, coupling, etc.) are measured with an outer diameter micrometer to calculate the roundness...
ΠΠΎΡΠΌΠΎΡΡΠ΅ΡΡ Π΄Π΅ΡΠ°Π»ΠΈ -
How to maintain the lubrication system of water-cooled chillers
1536Medium-sized water cooled chiller,refrigeration temperature range from -80 β~ -30β, safe,reliable, rapid cooling for the liquid, widely used in petrochemical, medical,pharmaceutical, biochemical and freeze-dried, military and other high-tech in...
ΠΠΎΡΠΌΠΎΡΡΠ΅ΡΡ Π΄Π΅ΡΠ°Π»ΠΈ -
ΠΠ°ΠΊ ΡΠΏΡΠ°Π²ΠΈΡΡΡΡ Ρ Π·Π°ΠΌΠ΅ΡΠ·Π°Π½ΠΈΠ΅ΠΌ Ρ ΠΎΠ»ΠΎΠ΄ΠΈΠ»ΡΠ½ΠΈΠΊΠ°?
1941Π‘ΡΡΠ΅ΡΡΠ²ΡΠ΅Ρ ΠΌΠ½ΠΎΠΆΠ΅ΡΡΠ²ΠΎ ΡΠΈΠΏΠΎΠ² ΡΠΈΠ»Π»Π΅ΡΠΎΠ², ΠΈ ΠΏΠΎΠΊΡΠΏΠ°ΡΠ΅Π»ΠΈ, Π·Π½Π°ΠΊΠΎΠΌΡΠ΅ Ρ ΡΡΠΈΠΌ ΠΏΡΠΎΠΈΠ·Π²Π΅Π΄Π΅Π½ΠΈΠ΅ΠΌ, ΠΎΠΏΡΠ΅Π΄Π΅Π»Π΅Π½Π½ΠΎ Π·Π½Π°ΠΊΠΎΠΌΡ Ρ ΡΠΈΠ»Π»Π΅ΡΠΎΠΌ. Π§ΡΠΎ ΠΊΠ°ΡΠ°Π΅ΡΡΡ Π·Π°ΠΌΠΎΡΠΎΠ·ΠΊΠΈ ΡΠΈΠ»Π»Π΅ΡΠ°, ΠΌΠ½ΠΎΠ³ΠΈΠ΅ Π»ΡΠ΄ΠΈ Π½Π΅ Π·Π½Π°ΡΡ, ΠΈ ΡΠΎΠ³Π΄Π° Π΄Π°Π²Π°ΠΉΡΠ΅ ΡΠ·Π½Π°Π΅ΠΌ ΠΎ Π½Π΅ΠΉ Π±ΠΎΠ»ΡΡΠ΅ Π²ΠΌΠ΅ΡΡΠ΅ Ρ LNEYA! 1. ΠΡΠ»ΠΈ ΡΡΠΎ ΡΠΈΠ»Π»Π΅Ρ, ΡΠΎ...
ΠΠΎΡΠΌΠΎΡΡΠ΅ΡΡ Π΄Π΅ΡΠ°Π»ΠΈ -
How to eliminate the failure of large thermal shock test chamber?
1566As technology continues to advance and improve, LNEYA recommends strict requirements for operators of large thermal shock test chambers. If used improperly, operators need to be able to face and resolve these problems in a timely manner. A large t...
ΠΠΎΡΠΌΠΎΡΡΠ΅ΡΡ Π΄Π΅ΡΠ°Π»ΠΈ
LNEYA ΠΡΠΎΠΌΡΡΠ»Π΅Π½Π½ΡΠ΅ ΡΠΈΠ»Π»Π΅ΡΡ ΠΡΠΎΠΈΠ·Π²ΠΎΠ΄ΠΈΡΠ΅Π»Ρ ΠΠΎΡΡΠ°Π²ΡΠΈΠΊ










