The Following Works Should Be Done Before Starting Industrial Chillers
2. For the compressor unit with water system, carefully check whether the cooling water system and chilled water system have water, and whether the water pressure is normal, whether the pipeline system of cooling water and chilled water is unblocked.
7. Check whether there is leakage in refrigerant system of industrial chiller and whether there is leakage in lubricating oil system.
Похожие рекомендации
-
-
-
Benefits of using heating and cooling equipment in the laboratory
1877Laboratory heating and cooling equipment (also known as: cold and heat integrated machine, refrigeration and heating cycle device) is a device that integrates cooling and heating, heating and cooling can be quickly converted, and the same medium (...
Посмотреть детали -
Noise description of common faults in high and low temperature integrated equipment
1877High-low temperature integrated machine equipment may cause malfunction due to improper operation, then how to deal with noise failure of the equipment, and then analyze the noise too high. The suction of high and low temperature integrated equipm...
Посмотреть детали
LNEYA Промышленные чиллеры Производитель Поставщик